Ashton Gate Stadium – Phase 3 Stand

Ashton Gate Stadium – Phase 3 Stand

Ashton Gate Stadium – Phase 3 Stand J & D Pierce (Contracts) Ltd. were awarded the circa 1800t structural steelwork package for phase 3 of Bristol City FC’s stadium redevelopment at Ashton Gate. The stand has triangular shaped truss spanning 108m supported...
NPCSS – National Performance Centre for Sport Scotland

NPCSS – National Performance Centre for Sport Scotland

NPCSS – Heriot Watt – Edinburgh J & D Pierce (Contracts) Ltd. were awarded the 1,700t steelwork package for the new National Performance Centre for Sport Scotland / Heriot Watt University. The award from Bowmer & Kirkland follows our re-engineering, with...
Clydebank Leisure Centre

Clydebank Leisure Centre

Clydebank Leisure Centre J & D Pierce (Contracts) Ltd were awarded the steelwork package for the new Clydebank Leisure facility, located on the bank of the River Clyde, by BAM Construction. Circa 1,100t Mixed Structural standard and Hollow Sections Forming...
TK Maxx Distribution Hub – West Yorkshire

TK Maxx Distribution Hub – West Yorkshire

TK Maxx Distribution Hub – West Yorkshire J & D Pierce (Contracts) Ltd were contracted to design, fabricate and erect structural steelwork at regional distribution facilities at Trinity Farm, Knottingley – West Yorkshire. This consisted of 5 multi span portal...
Peel Ports – Liverpool Docks

Peel Ports – Liverpool Docks

Peel Ports – Liverpool Docks J&D Pierce (Contracts) Ltd manufactured and erected the structural steelwork on a new warehouse facility at Liverpool Docks. It was approx. 376m long and 70m wide, divided into three separate sections each of around 94,000 sq ft with a...