Ocado Andover Bridge Installation Complete
Ocado Andover Bridge Installation Complete
J&D Pierce Contracts have completed the installation of a 30 tonne suspension link bridge at the Ocado Andover Site. The link bridge between the main facility and the multi-storey car park marks the final installation of structural steelwork onsite. Between Ocado Andover and its sister site Ocado Purfleet over 5000 tonnes of structural steelwork have been erected!