Silverstone Bridge

Location Towcester   Completion Date Oct 2022   Tonnage 200Te
Location Towcester Completion Date Oct 2022 Tonnage 200Te

The new bridge at Silverstone Circuit provides a convenient covered walkway to bridge the gap between the new trackside hotel and the international conference and exhibition centre.

Overlooking the Hamilton Straight start-finish line, the new 80m bridge at Silverstone Circuit provides a convenient covered walkway to bridge the gap between the new trackside hotel and their international conference and exhibition centre.

 

The bridge was designed and built by J&D Pierce involving an asymmetric warran truss to offset footfall induced vibrations, tubular framing and spider fixings to accommodate faceted glass facades.

 

With cladding and glass pre-installed, the bridge was erected in three modular sections from one-side access on the racetrack in a tight three-day window using smart temporary works involving pretensioned shores and piles to avoid track constraints.