Social Media

LinkedIn | J & D Pierce     Facebook | J & D Pierce     Twitter | J & D Pierce     Instagram | J & D Pierce     YouTube | J & D Pierce

South Caldecotte, Units 1-4

South Caldecotte, Units 1-4

This project consisted of four Individual portal frame units all with a similar design which includes complex hipped roof’s and open plan office space.
The contract works included structural steelwork, accumulating to over 2700T aswell as the installation of precast stairs, all co-ordinated within our 3D modelling software.

read more
Anfield Stadium News Post

Anfield Stadium News Post

This project is nearing completion from our end with the last large lift taking place on the 10th of february this year (2023).

10/02/23 the west eyebrow lifted in to place. (see images)

read more
Prologis Disctribution Park Coventry, Dirft DC9 & DC10

Prologis Disctribution Park Coventry, Dirft DC9 & DC10

This project consisted of two multi span portal frame buildings. DC9 unit had approx 1200T of hot rolled steelwork (330’000 Sq Ft), DC10 building had approx. 2200T, DC10 building had an external office garden roof, with a glazed screen to three sides. (630’000 Sq Ft) They were both spec warehouses, had curved rooves, and feature window frames.

read more
HarperCollins, Nova Business Park

HarperCollins, Nova Business Park

This project completed by our cladding division involves a 50,000 square metre Barrel Vault roof, Single ply membrane roofing over tapered rockwool insulation, feature flat horizontal cladding to the office building and 20,000 square metres of built up insulated wall cladding.

read more
Oxford Science Park

Oxford Science Park

This project was fabricated at both our Glengarnock facility and our facility in East Kilbride ( Strubeam ) then painted in the Glengarnock Main works paint shop. It had tight access due to railway restrictions and minimal building external footprint, another project completed ahead of programme despite its challenges.

read more
Silverstone Bridge

Silverstone Bridge

The new bridge at Silverstone Circuit provides a convenient covered walkway to bridge the gap between the new trackside hotel and the international conference and exhibition centre. Overlooking the Hamilton Straight start-finish line…

read more
Top Golf Glasgow

Top Golf Glasgow

A local project awarded to the special projects team in Glengarnock along with the cladding division, various types of fabrication in this project from column and beam through to balustrades and steel stairs. Another great project completed…

read more
Eastbrook Studios

Eastbrook Studios

We are currently carrying out the fabrication and erection of the new Eastbrook Film Studios which are located in Dagenham. This contract comprises 6 No buildings which in turn will incorporate film studio set buildings and associated offices…

read more