⸺ Polimeri Europa
⸺ Location Grangemouth ⸺ Completion Date 2014 ⸺ Tonnage 1,400Te
Location Grangemouth Completion Date 2014 Tonnage 1,400Te
J&D Pierce provided a joint steelwork and cladding package at Polimeri in a live factory environment. J&D Pierce was tasked with the fabrication, supply, and erection of a cutting-edge processing facility, complete with integrating metalwork features such as stairs, ladders, flooring, and handrails.
Our comprehensive scope extended to the installation of roofing, cladding, and rainwater goods across multiple stand-alone buildings seamlessly interconnected by pipe racks, walkways, and access platforms. Navigating the intricacies of working amidst live plant operations, our dedicated workforce excels in ensuring a nonintrusive construction process.